XintaoPump · Industrial Pump SolutionsCatalog-based product library · Engineering selection support
Quality & testing

Verification before shipment starts with the duty point.

The supplied catalog describes machining, testing and quality-control resources. Product acceptance criteria should be agreed for the actual order and application.

Pump performance testing

The company introduction states that a modern water-pump performance test center is available.

Material / defect inspection

The catalog lists ultrasonic flaw detection, direct-reading spectral analysis, chemical analysis and metallographic equipment.

Order-specific confirmation

Material, duty point, motor, sealing arrangement and required test documents should be fixed in the technical quotation / order.

Recommended pre-order checklist

  • Confirm flow and total head at the required operating point.
  • Confirm medium composition, concentration, temperature, density, viscosity and solids.
  • Confirm wetted materials against actual chemistry.
  • Confirm seal / seal-less arrangement and any flushing / cooling plan.
  • Confirm motor voltage, frequency, enclosure and hazardous-area requirements.
  • Agree performance test / inspection documents and acceptance criteria.

Important

Catalog ranges are product-family references, not a substitute for a selected pump curve, NPSH check, motor sizing or material-compatibility review.

Send engineering RFQ
WhatsApp